Rainwater treatment
Rainwater treatment uses a graded interception process to purify surface runoff. The core filtration unit includes:
Heavy metal targeted adsorption: special ion exchange resin accurately captures metal ions such as lead and zinc (removal rate > 98%)
Multi-layer media filtration: quartz sand + activated carbon composite filter bed intercepts > 50μm suspended solids (turbidity ≤ 1NTU)
Membrane deep treatment: 0.1μm ultrafiltration membrane blocks microorganisms and colloids (SDI value is stable < 4)
Key indicators of system operation and maintenance
Filter media maintenance
Backwashing is required when the pressure difference of the multi-media filter layer is > 0.15MPa
Activated carbon adsorption saturation Cycle ≤ 6 months
Ecological facility control
Detention pond sludge accumulation depth < 30cm
Artificial wetland plant coverage ≥ 85%
Project implementation focus
Pretreatment enhancement: pre-treatment of cyclone sand removal device (SS removal rate > 80%)
Intelligent monitoring: online turbidity meter + heavy metal sensor real-time warning
Emergency guarantee: parallel filter tank design ensures continuous operation during the rainy season
Environmental benefit verification
Pollution control
Reduction of runoff petroleum substances ≥ 90%
TSS load reduced to below 20mg/L
Ecological protection
Heavy metal compliance rate of receiving water bodies 100% (GB 3838-2002 Class III standard)
Catchment ecological restoration cycle shortened by 40%
Resource benefits
Rainwater reuse rate reaches 70% (greening/cooling water replacement)
Municipal sewage treatment load reduced by 35%